StegVerse public mirror · formalism-tests

Stages 1–31 Completed

This page mirrors the completed StegVerse formalism-tests roadmap from data-continuation admissibility through governed production accreditation and revocation.

Stages 1–31: PASSED StegVerse-001 / Beta_Orionis Mirror only · not proof authority

Mirror Boundary

This Site page is a public mirror. It is not proof authority, install authority, packet authority, node authority, FinCo authority, or production accreditation authority.

formalism-tests = proof/test authority
Site = public mirror
StegVerse-001 = governed work-entity
production = accredited participation, not sovereign authority

Core Results

Data

Same data does not imply same continuation admissibility.

Composite

Local allow plus local allow does not imply composite allow.

Commit Time

Admissibility must be resolved at the binding moment.

Replay

Replay reconstructs consequence state but cannot reverse consequence.

Discovery

Discovery observes, models, compares, classifies, and proposes. It does not install.

Install Plan

An install plan is a candidate transition, not installation authority.

Packet

The packet is portable evidence of a proposed governed transition, not installation authority.

Production

Production means accredited participation, not sovereign authority.

Stage 31 Declared-Task Summary

task_id: stage31_production_accreditation_revocation_tests
success: true
case_count: 26
assertion_count: 66
receipt_count: 26

ALLOW_ACCREDITATION: 3
LEDGER_ACCREDITATION: 1
REQUIRE_REACCREDITATION: 1
REVOKE_ACCREDITATION: 1
REQUIRE_REVIEW: 1
FAIL_CLOSED: 19

Stages

Stage 1 — Initial Continuation GroundingPASSED
Stage 2 — Same Data, Different RolePASSED
Stage 3 — Compound ContinuationPASSED
Stage 4 — Representation and Consequence BoundaryPASSED
Stage 5 — Transition Elements and AI Block BasisPASSED
Stage 6 — Admissible Existence Unified GatePASSED
Stage 7 — Boundary Reset and EvolutionPASSED
Stage 8 — AI Block Scope and Escape ControlPASSED
Stage 9 — FinCo Chain AdmissibilityPASSED
Stage 10 — Transition Table BindingPASSED
Stage 11 — Active Work-Entity PreparationPASSED
Stage 12 — AI-Governance Scope ReadinessPASSED
Stage 13 — Active Work-Entity Release DeltaPASSED
Stage 14 — Transition Table AI Governance BindingPASSED
Stage 15 — Work-Entity Policy ScopePASSED
Stage 16 — Work-Entity Release/Queue IntegrationPASSED
Stage 17 — Self-Audit and Drift DetectionPASSED · stage17_self_audit_tests
Stage 18 — Sandbox Candidate GenerationPASSED · stage18_sandbox_candidate_generation_tests
Stage 19 — Candidate Review LoopPASSED · stage19_candidate_review_loop_tests
Stage 20 — Release Candidate AssemblyPASSED · stage20_release_candidate_assembly_tests
Stage 21 — Canonical Upgrade ReplayPASSED · stage21_canonical_upgrade_replay_tests
Stage 22 — Public Mirror PropagationPASSED · stage22_public_mirror_propagation_tests
Stage 23 — Ingestible Bundle CustodyPASSED · stage23_ingestible_bundle_tests
Stage 24 — Autonomous Test PlanningPASSED · stage24_test_plan_tests
Stage 25 — Entity Operating CharterPASSED · stage25_entity_charter_tests
Stage 26 — StegVerse-001 Declared Testing LoopPASSED · stage26_stegverse001_testing_loop_tests
Stage 27 — Discovery-to-Canonical State DBPASSED · stage27_discovery_to_canonical_state_tests
Stage 28 — Canonical Diff and Install Plan CandidatePASSED · stage28_canonical_diff_install_plan_tests
Stage 29 — Optional Node Status and FinCo EligibilityPASSED · stage29_node_status_finco_eligibility_tests
Stage 30 — Governed Instantiation PacketPASSED · stage30_governed_instantiation_packet_tests
Stage 31 — Production Accreditation and Revocation BoundaryPASSED · stage31_production_accreditation_revocation_tests

Node and FinCo Boundary

Core installation does not imply node participation. Node participation does not imply FinCo eligibility. FinCo eligibility requires explicit node status, valid consent/access/use receipts, compensation rules, revocation rules, and intact chain evidence.

{
  "core_unit_installed": true,
  "node_participation_opt_in": false,
  "node_status": "NOT_A_NODE",
  "finco_participation_requested": false,
  "finco_participation_allowed": false
}

Next Integration Direction

The next phase is controlled integration: update the theorem proof map, add task and artifact indexes, run discovery against the current core-lite state, prepare a production-candidate review packet, and harden master-record export.